Aerospace Aviation360, a trusted distributor under ASAP Semiconductor, is pleased to supply Part CK-104 LONG LEAD, listed as Capacitor Fixed Ceramic Dielectr. This component is registered under National Stock Number (NSN) 5910001135499 and classified within Federal Supply Class (FSC) 5910 Capacitors, with traceability confirmed through CAGE Code 71590.
For precise identification, the part CK-104 LONG LEAD is categorized under Federal Supply Group (FSG) 59 Electrical And Electronic Equipment Components, with additional reference points including NIIN 00-113-5499, NCB Code 00 (USA), and INC 00007. As a leading provider of aviation and aerospace components, we ensure seamless procurement of mission-critical parts. Let us know if further details or support is required.
For precise identification, the part CK-104 LONG LEAD is categorized under Federal Supply Group (FSG) 59 Electrical And Electronic Equipment Components, with additional reference points including NIIN 00-113-5499, NCB Code 00 (USA), and INC 00007. As a leading provider of aviation and aerospace components, we ensure seamless procurement of mission-critical parts. Let us know if further details or support is required.