Aerospace Aviation360, a trusted distributor under ASAP Semiconductor, is pleased to supply Part CK-104 LONG LEAD, listed as Capacitor Fixed Ceramic Dielectr. This component is registered under National Stock Number (NSN) 5910001135499 and classified within Federal Supply Class (FSC) , with traceability confirmed through CAGE Code 71590.
For precise identification, the part CK-104 LONG LEAD is categorized under Federal Supply Group (FSG) , with additional reference points including NIIN 00-113-5499, NCB Code 00 (USA), and INC 00007. As a leading provider of aviation and aerospace components, we ensure seamless procurement of mission-critical parts. Let us know if further details or support is required.
For precise identification, the part CK-104 LONG LEAD is categorized under Federal Supply Group (FSG) , with additional reference points including NIIN 00-113-5499, NCB Code 00 (USA), and INC 00007. As a leading provider of aviation and aerospace components, we ensure seamless procurement of mission-critical parts. Let us know if further details or support is required.